Contract manufacturing & component suppliers

Retain the parts. Recover the working space.

Offsite storage and inventory for suitable manufacturing components, reference parts and fixtures. For medical device contract manufacturers and other precision suppliers, start by defining the retention and handling requirements.

Companies throughout the United States can ship approved inventory to RAD. Access, item suitability and logistics are confirmed before storage.

Keep what matters

Keep the identity with the retained material.

A package of reference parts is useful only if the right team can identify it and request it when needed. RAD combines item photos, identifiers and inventory visibility for suitable dry components and manufacturing hardware. Controlled retain requirements are reviewed before acceptance.

Possible first items

What your team could store.

Examples are subject to the actual contents, size, weight and handling requirements.

Component retains

Suitable unused plastic or metal components, with clear package identification.

Reference parts

Approved comparison parts and earlier component revisions, subject to the owner's requirements.

Inspection and assembly fixtures

Inactive jigs, nests, adapters and other suitable manufacturing aids.

Development stock

Clearly identified components and spare assemblies retained after a program or production transition.

A clear first step

Define the retain program before moving it.

Confirm the part and lot identifiers, packaging, required storage conditions, retention period, retrieval expectations and authorization for release or disposal. A routine equipment-storage arrangement should not be assumed to meet a controlled manufacturing retention requirement.

Quality, manufacturing engineering, operations and the inventory owner should agree on the first batch. Special environmental needs or controlled-storage requirements require separate review and are not part of an automatic standard acceptance.

See package rates and handling details

Before you start

A few useful answers.

Do you accept medical device component retains?

Potentially. We review dry, nonhazardous retains against their identification, handling and retention requirements before acceptance.

Can components remain separated by lot?

Lot-by-lot storage can be reviewed. Provide identifiers and physical separation requirements for approval before shipment.

Does this offer promise GMP-qualified storage?

No. Standard RAD storage is not represented as validated GMP storage or a qualified retention program. Any such requirements need separate review.

How are returns handled?

Request full packages or eligible counted quantities in RAD Workspace. Review handling and shipping charges before confirming.